Invention Grant
- Patent Title: Downhole flow control, joint assembly and method
-
Application No.: US14418834Application Date: 2013-10-11
-
Publication No.: US10012032B2Publication Date: 2018-07-03
- Inventor: Charles S. Yeh , Michael D. Barry , Michael T. Hecker , Tracy J. Moffett
- Applicant: Charles S. Yeh , Michael D. Barry , Michael T. Hecker , Tracy J. Moffett
- Applicant Address: US TX Spring
- Assignee: ExxonMobil Upstream Research Company
- Current Assignee: ExxonMobil Upstream Research Company
- Current Assignee Address: US TX Spring
- Agency: ExxonMobil Upstream Research Company—Law Department
- International Application: PCT/US2013/064674 WO 20131011
- International Announcement: WO2014/066071 WO 20140501
- Main IPC: E21B17/02
- IPC: E21B17/02 ; E21B43/08 ; E21B43/14 ; E21B17/042 ; E21B17/18 ; E21B33/124 ; E21B34/12 ; E21B43/16 ; E21B43/24 ; E21B34/06 ; E21B43/04 ; E21B34/00

Abstract:
A method for completing a wellbore in a subsurface formation includes providing a first base pipe and a second base pipe. Each base pipe comprises a tubular body forming a primary flow path and has transport conduits along an outer diameter for transporting fluids as a secondary flow path. The method also includes connecting the base pipes using a coupling assembly. The coupling assembly has a manifold, and a flow port adjacent the manifold that places the primary flow path in fluid communication with the secondary flow path. The method also includes running the base pipes into the wellbore, and then causing fluid to travel between the primary and secondary flow paths. A wellbore completion apparatus is also provided that allows for control of fluid between the primary and secondary flow paths.
Public/Granted literature
- US20150218909A1 DOWNHOLE FLOW CONTROL, JOINT ASSEMBLY AND METHOD Public/Granted day:2015-08-06
Information query