Invention Grant
- Patent Title: LNG production plant and corresponding method of construction
-
Application No.: US15822829Application Date: 2017-11-27
-
Publication No.: US10240862B2Publication Date: 2019-03-26
- Inventor: Solomon Aladja Faka , Geoffrey Brian Byfield , Benjamin Dean Warwick
- Applicant: Woodside Energy Technologies Pty Ltd
- Applicant Address: AU Perth
- Assignee: WOODSIDE ENERGY TECHNOLOGIES PTY LTD
- Current Assignee: WOODSIDE ENERGY TECHNOLOGIES PTY LTD
- Current Assignee Address: AU Perth
- Agency: Edell, Shapiro & Finnan, LLC
- Priority: AU2015901975 20150528
- Main IPC: B63B25/16
- IPC: B63B25/16 ; B63B27/30 ; F25J1/02 ; B63B35/00 ; E02D27/32 ; F25J1/00 ; E02B17/00 ; B63B1/04 ; B63B35/44

Abstract:
An LNG production plant and a method of constructing the LNG production plant is disclosed. The LNG production plant includes at least one plant module and a support structure to support the plant module. Each plant module is dry transported by a heavy lift vessel and subsequently transferred to the support structure without lifting the plant module from a deck of the vessel. The support structure includes a landing substructure onto which the plant module is transferred from the vessel. Landing substructure may be onshore or offshore. The support structure may also include one or more onshore support substructures and a transfer path enabling a plant module to be moved from the landing substructure to a corresponding onshore support substructure.
Public/Granted literature
- US20180224204A1 LNG Production Plant and Corresponding Method of Construction Public/Granted day:2018-08-09
Information query