Production system having constraint evaluator generating constrained sequences
Abstract:
A method for configuring a manufacturing plant includes generating a set of initial production schedules for manufacturing an entity, determining a set of consistent production schedules given each of the initial production schedules, selecting an instance of the consistent production schedules, generating a schedule for manufacturing instances of the entity, and operating the manufacturing plant using the schedule.
Information query
Patent Agency Ranking
0/0