Infrastructure management system with support for breakout cables
Abstract:
One embodiment is directed to a method of tracking, using an automated infrastructure management (AIM) system, connections made using a breakout cable. The breakout cable comprises a plurality of breakout connectors at a breakout end of the breakout cable. The method comprises identifying a sequence for adding or removing connections involving the breakout connectors of the breakout cable, identifying events associated with adding or removing connections involving the breakout connectors of the breakout cable, and associating the breakout connectors of the breakout cable with added or removed connections based on the identified sequence and the identified events. Other embodiments are disclosed.
Public/Granted literature
Information query
Patent Agency Ranking
0/0