System and method for providing a tradeoff between time and quality for a task
Abstract:
Systems, methods, and other embodiments are disclosed that are configured to make tradeoffs between time and quality for tasks of a project in a computerized project plan. In one embodiment, at task of a project is represented as a task data structure in a computerized project plan. A time duration in which to complete the task may be automatically transformed in the task data structure by manually changing a quality level of a result of the task in the task data structure in response to user interaction with a graphical user interface of the computerized project plan. Similarly, the quality level of the result of the task may be automatically transformed in the task data structure by manually changing the time duration in which to complete the task in the task data structure in response to user interaction with the graphical user interface of the computerized project plan.
Information query
Patent Agency Ranking
0/0