Invention Grant
- Patent Title: Yieldable construction method for early releasing surrounding rock deformation on weak counter-inclined slope
-
Application No.: US15622644Application Date: 2017-06-14
-
Publication No.: US10378172B2Publication Date: 2019-08-13
- Inventor: Weijiang Chu , Chunsheng Zhang , Jing Hou , Jiayao Wu , Yong Zhou
- Applicant: PowerChina Huadong Engineering Corporation Limited
- Applicant Address: CN Hangzhou
- Assignee: PowerChina Huadong Engineering Corporation Limited
- Current Assignee: PowerChina Huadong Engineering Corporation Limited
- Current Assignee Address: CN Hangzhou
- Agency: Wayne & Ken, LLC
- Agent Tony Hom
- Priority: CN201610539275 20160706
- Main IPC: E02D17/00
- IPC: E02D17/00 ; E02D17/18 ; E02D17/16 ; E02D17/20 ; F42D3/04

Abstract:
The present invention provides a yieldable construction method for early releasing surrounding rock deformation on a weak toppling slope, thereby reducing surrounding rock toppling deformation risk in and after an excavation process and ensuring overall slope stability and safety of a supporting structure. A technical solution of the present invention is as follows: loosing a rock mass through controlled blasting; inducing toppling deformation of the slope by injecting water and softening a blasting relaxation part of the rock mass; determining timing of water injection by monitoring slope surface displacement characteristics of the slope; and performing a normal excavation process of the toppling deformation slope after injecting is completed. The present invention is applicable to design and construction of high slope engineering of a special kind of rocks, i.e., a toppling deformation slope composed of weak rock masses.