Model-based pump-down of wireline tools
Abstract:
A pump-down method includes deploying a tool in a well via a wireline and measuring a tension of the wireline. The method also includes determining a difference between the measured tension and a reference tension. The method also includes updating at least one of a pump rate and a wireline speed used for pump-down of the tool based on the difference and at least one control parameter obtained at least in part from prediction model results.
Public/Granted literature
Information query
Patent Agency Ranking
0/0