Invention Grant
- Patent Title: Method and loading module to mechanically increase pile/drilled shaft end bearing stiffness
-
Application No.: US16081018Application Date: 2017-02-21
-
Publication No.: US10407859B2Publication Date: 2019-09-10
- Inventor: Sherif A. Elfass , Gary M. Norris
- Applicant: Board of Regents of the Nevada System of Higher Education on Behalf of the University of Nevada, Reno
- Applicant Address: US NV Reno
- Assignee: BOARD OF REGENTS OF THE NEVADA SYSTEM OF HIGHER EDUCATION ON BEHALF OF THE UNIVERSITY OF NEVADA, RENO
- Current Assignee: BOARD OF REGENTS OF THE NEVADA SYSTEM OF HIGHER EDUCATION ON BEHALF OF THE UNIVERSITY OF NEVADA, RENO
- Current Assignee Address: US NV Reno
- Agency: Schwabe Williamson & Wyatt, P.C.
- International Application: PCT/US2017/018757 WO 20170221
- International Announcement: WO2017/147089 WO 20170831
- Main IPC: E02D5/38
- IPC: E02D5/38 ; E02D15/04 ; E02D5/66

Abstract:
Disclosed herein are a module, system and technique to enhance end bearing stiffness of pile/drilled shafts. In particular, methods, systems and loading modules which account for tip resistance in overall pile/shaft capacity are provided which increase the stiffness of the bearing soil. The techniques utilize a mechanical system to preload the soil under the shaft tip, thus allowing the users to confidently account for the gained resistance at an acceptable level of movement. Each shaft/pile is preloaded during construction to verify its load carrying capability.
Public/Granted literature
- US20190071834A1 METHOD AND LOADING MODULE TO MECHANICALLY INCREASE PILE/DRILLED SHAFT END BEARING STIFFNESS Public/Granted day:2019-03-07
Information query