- Patent Title: Piling construction management method
-
Application No.: US15715782Application Date: 2017-09-26
-
Publication No.: US10557241B2Publication Date: 2020-02-11
- Inventor: Takahiko Kashimoto
- Applicant: Oak Co., Ltd
- Applicant Address: JP
- Assignee: Oak Co., Ltd.
- Current Assignee: Oak Co., Ltd.
- Current Assignee Address: JP
- Agency: St. Onge Steward Johnston & Reens LLC
- Priority: JP2015-254925 20151225; JP2016-047296 20160310; JP2016-071845 20160331; JP2016-078302 20160408; JP2016-120081 20160616
- Main IPC: E02D1/02
- IPC: E02D1/02 ; E02D1/00 ; G01L5/00 ; E02D13/06 ; E02D5/24 ; E02D5/34 ; E02D7/10

Abstract:
In a piling construction management method a support strength of a hole bottom is measured with a penetration testing device before erecting a piling in a piling hole. The piling is erected in the piling hole when the measurement is at least a prescribed value. The penetration testing device has a knocking block with an integrated penetration shaft and the block is struck by a drive hammer in free-fall. The penetration testing device determines the support strength from the number of impacts required for the penetration shaft to penetrate to a prescribed depth from the hole bottom.
Public/Granted literature
- US20180016763A1 Piling Construction Management Method Public/Granted day:2018-01-18