Systems and methods for generating scheduling options in consideration of elements within a construction site
Abstract:
Systems and methods for generating scheduling options in consideration of space and resource constraints in accordance with embodiments of the invention are disclosed. One embodiment of the invention includes a scheduling application that configures the processor to generate a project schedule from a TODO list comprising a plurality of construction operations, where the construction operations comprise at least one specific space requirements within a construction site, resource requirements, and a duration time.
Information query
Patent Agency Ranking
0/0