Method of power management in pile foundation having a base machine and an attachment installed thereat
Abstract:
The present invention relates to a method of power management during pile foundation having a base machine for excavating a borehole and an attachment installed at the base machine for a simultaneous introduction of a casing into the ground, wherein the energy supply for the attachment is at least partially provided by the base machine and a control of the base machine dynamically regulates the energy flow from the base machine to the attachment.
Information query
Patent Agency Ranking
0/0