Data processing system test suite management including dynamic resource reallocation and reconfiguration
Abstract:
In response to receiving a test suite specification, a processor of a testing platform determines a schedule of execution of a test suite to test a system under test (SUT). The SUT has a hardware resource set including at least one of a set including a processor system and a data storage system, and the test suite includes a plurality of tests, each including a respective set of one or more testcases. The processor initiates execution of the test suite on the SUT in accordance with the schedule. In response to failure of a hardware resource during execution of the test suite, the processor automatically and dynamically reallocating a test in the test suite to at least one different hardware resource in the hardware resource set.
Information query
Patent Agency Ranking
0/0