Schedule management system
Abstract:
A schedule management system 1 having isolators 3 (production facilities) and a main control device 4 for managing a production schedules of all the isolators 3. The production process of each isolator constituting the production schedule has a plurality of sub-processes, the production status being determined in the sub-process. The main control device 4 adds a new separating operation to the passage process and performs an update when the main control device 4 obtains a determination result that the separation of cells in a separation state confirmation operation (sub-process) in the passage process is insufficient while a passage process for cells A is being carried out in the isolators. The main control device 4 alters the start time of a culture medium exchange process for other cells B different from the updated passage operation, and updates the production schedule.