Group determination method and group determination apparatus
Abstract:
A group determination method includes a step of calculating an external set-up work time for an external set-up work by which a component supplier used in a group that is a next production target of a group under production in a component mounting line, including a plurality of the component mounters capable of attaching and detaching a component supply carriage which can arrange a plurality of the component suppliers (tape feeders), is removed from the component mounting line and arranged in the component supply carriage; and a step of calculating a production completion time at which the production of all the mounting boards that are the production targets is completed in consideration of the external set-up work time. A plurality of groups which are common in an arrangement of component suppliers for the mounting boards that are the production targets are determined so that production completion time is shortened.
Public/Granted literature
Information query
Patent Agency Ranking
0/0