Methods and apparatus for switching between bandwidth parts
Abstract:
A user equipment (UE) receives control signaling in a scheduling bandwidth part (BWP). The control signaling indicates switching from a first active BWP to a second active BWP or switching from a first active BWP pair to a second active BWP pair for the UE. The control signaling aligns with a time unit boundary, such as a slot boundary, that is associated with the scheduling BWP. In the event that a scheduled BWP for a UE has a different numerology than a scheduling BWP that is currently active for the UE, the UE could switch from the scheduling BWP to the scheduled BWP based on a control signaling monitoring periodicity of the scheduled BWP.
Public/Granted literature
Information query
Patent Agency Ranking
0/0