Prevent application outages through operations driven development
Abstract:
A method, system, and computer program product to integrate service management tools with enterprise product development tools to determine Ops readiness scores. The method may include receiving one or more logs of bug tracking information from a client module, where the bug tracking information corresponds to one or more applications with one or more production bugs. The method may also include compiling the one or more logs. The method may also include receiving reports of at least Ops issues of the one or more applications and latest requirements of the one or more applications from a company module, where the latest requirements include at least current deliverables. The method may also include mapping the compiled one or more logs and the reports. The method may also include generating an Ops readiness score for each of the current deliverables, based on the mapping.
Public/Granted literature
Information query
Patent Agency Ranking
0/0