Invention Grant
- Patent Title: Wind turbine system with integrated reactive power compensation device
-
Application No.: US16403814Application Date: 2019-05-06
-
Publication No.: US11056884B2Publication Date: 2021-07-06
- Inventor: Yashomani Yashodhan Kolhatkar , Olive Ray , Kasi Viswanadha Raju Gadiraju , Arvind Kumar Tiwari
- Applicant: General Electric Company
- Applicant Address: US NY Schenectady
- Assignee: General Electric Company
- Current Assignee: General Electric Company
- Current Assignee Address: US NY Schenectady
- Agency: Dority & Manning, P.A.
- Main IPC: H02J3/18
- IPC: H02J3/18 ; F03D7/02 ; F03D80/60 ; F03D9/25 ; H02K7/18 ; H02K9/00 ; H02M5/458 ; H02P9/00 ; H02P9/02

Abstract:
A wind turbine system is configured to supply real and reactive power to a grid and includes a tower, and a generator within a nacelle configured atop the tower. The generator is connected to a rotor, which is connected to a hub that includes a plurality of turbine blades mounted thereon. A power converter is configured at a location within the tower. A reactive power compensation device is also configured at the location within the tower, the reactive power compensation device operably configured with the power converter so as to provide reactive power in combination with reactive power generated by the power converter.
Information query