Systems and methods utilizing AC overbuilt renewable electric generation resource and charge storage device providing desired capacity factor
Abstract:
An integrated renewable energy source (RES) and energy storage system (ESS) facility configured to supply power to an AC electrical grid includes energy storage system capacity and inverter capacity that are larger than a point of grid interconnect (POGI) limit for the facility, enabling high capacity factors and production profiles that match a desired load. At least one first DC-AC power inverter is associated with RES, and at least one second AC-DC power inverter is associated with the ESS. AC-DC conversion is used when charging the ESS with RES AC electric power, and DC-AC conversion utility is used when discharging ESS AC electric power to the electric grid. Aggregate DC-AC inverter utility exceeds the facility POGI limit, and excess RES AC electric power may be diverted to the second inverter(s).
Information query
Patent Agency Ranking
0/0