Multi-time scale energy storage management framework for performance-based frequency regulation (FR) market
Abstract:
The multi-time scale battery energy/storage system (BES) management framework proposed in the present disclosure can be used for day-ahead capacity scheduling and real-time BES operation control in the latest performance-based frequency regulation market. This multi-time scale BES management framework includes three control layers: long-term battery performance planning layer, day-ahead regulation capacity scheduling layer, real-time battery operation control layer. These three layers will coordinate with each other, and operate at different time scales.
Information query
Patent Agency Ranking
0/0