Invention Grant
- Patent Title: Multi-time scale energy storage management framework for performance-based frequency regulation (FR) market
-
Application No.: US16449054Application Date: 2019-06-21
-
Publication No.: US11183840B2Publication Date: 2021-11-23
- Inventor: Yanzhu Ye , Bo Yang , Panitarn Chongfuangprinya , Sumito Tobe
- Applicant: Hitachi, Ltd.
- Applicant Address: JP Tokyo
- Assignee: Hitachi, Ltd.
- Current Assignee: Hitachi, Ltd.
- Current Assignee Address: JP Tokyo
- Agency: Procopio, Cory, Hargreaves & Savitch LLP
- Main IPC: G05B15/02
- IPC: G05B15/02 ; H02J3/00 ; H01M10/44 ; H01M10/42

Abstract:
The multi-time scale battery energy/storage system (BES) management framework proposed in the present disclosure can be used for day-ahead capacity scheduling and real-time BES operation control in the latest performance-based frequency regulation market. This multi-time scale BES management framework includes three control layers: long-term battery performance planning layer, day-ahead regulation capacity scheduling layer, real-time battery operation control layer. These three layers will coordinate with each other, and operate at different time scales.
Information query