Invention Grant
- Patent Title: Method for starting up a gas turbine engine of a combined cycle power plant
-
Application No.: US16963620Application Date: 2018-02-20
-
Publication No.: US11255218B2Publication Date: 2022-02-22
- Inventor: Kok-Mun Tham , Christian Keune , Nicolas Benjamin Wappler
- Applicant: Siemens Energy Global GmbH & Co. KG
- Applicant Address: DE Munich
- Assignee: Siemens Energy Global GmbH & Co. KG
- Current Assignee: Siemens Energy Global GmbH & Co. KG
- Current Assignee Address: DE Munich
- International Application: PCT/US2018/018776 WO 20180220
- International Announcement: WO2019/164475 WO 20190829
- Main IPC: F01D19/00
- IPC: F01D19/00 ; F01K13/02 ; F02C9/54

Abstract:
The invention relates to a method for starting up a gas turbine engine of a combined cycle power plant. The method includes applying load to the gas turbine engine and increasing the load until a predetermined combustor firing temperature is reached, while keeping the adjustable inlet guide vanes in a start position adapted to reduce the mass flow of air into the compressor; further increasing the load of the gas turbine engine while opening the adjustable inlet guide vanes and keeping the predetermined combustor firing temperature constant until the inlet guide vanes reach an end position adapted to increase the mass flow of air into the compressor; further increasing the load of the gas turbine engine while keeping the adjustable inlet guide vanes in the end position until a predetermined load of the gas turbine engine is reached.