Controlling fluid volume variations of a reservoir under production
Abstract:
Techniques for controlling a hydrocarbon production system include determining a first estimate of a prior FVC detectability probability map based on a plurality of reservoir data that includes four-dimensional (4D) seismic data of a subterranean reservoir; determining a second estimate of the prior FVC detectability probability map under seismic data noise conditions; determining an updated detectable FVC probability based on the 4D seismic data; determining an updated FVC probability based on the updated detectable FVC probability and the first and second estimates of the prior FVC detectability probability maps; and generating a control instruction for at least one of a fluid injection system or a hydrocarbon production assembly based on the updated FVC probability.
Information query
Patent Agency Ranking
0/0