Invention Grant
- Patent Title: Model-based parameter estimation for directional drilling in wellbore operations
-
Application No.: US15935659Application Date: 2018-03-26
-
Publication No.: US11268370B2Publication Date: 2022-03-08
- Inventor: Francesco Quattrone , Christian Hansen , Oliver Hoehn , Joern Koeneke , Bruno Morabito , Rolf Findeisen
- Applicant: Francesco Quattrone , Christian Hansen , Oliver Hoehn , Joern Koeneke , Bruno Morabito , Rolf Findeisen
- Applicant Address: DE Hannover; DE Hambuehren; DE Hannover; DE Burgdorf; IT Reggio Calabria; DE Stuttgart
- Assignee: Francesco Quattrone,Christian Hansen,Oliver Hoehn,Joern Koeneke,Bruno Morabito,Rolf Findeisen
- Current Assignee: Francesco Quattrone,Christian Hansen,Oliver Hoehn,Joern Koeneke,Bruno Morabito,Rolf Findeisen
- Current Assignee Address: DE Hannover; DE Hambuehren; DE Hannover; DE Burgdorf; IT Reggio Calabria; DE Stuttgart
- Agency: Cantor Colburn LLP
- Main IPC: G05B13/04
- IPC: G05B13/04 ; G05B13/02 ; E21B49/00 ; E21B45/00 ; E21B7/04 ; E21B44/04 ; E21B47/04 ; E21B44/06

Abstract:
Examples of techniques for model-based parameter and state estimation for directional drilling in a wellbore operation are provided. In one example implementation according to aspects of the present disclosure, a computer-implemented method includes receiving, by a processing device, measurement data from the wellbore operation. The method further includes performing, by the processing device, an online estimation of at least one of a parameter to generate an estimated parameter and a state to generate an estimated state, the online estimation based at least in part on the measurement data. The method further includes generating, by the processing device, a control input to control an aspect in the wellbore operation based at least in part on the at least one of the estimated parameter and the estimated state. The method further includes executing a control action based on the control input to control the aspect of the wellbore operation.
Public/Granted literature
- US20190292898A1 MODEL-BASED PARAMETER ESTIMATION FOR DIRECTIONAL DRILLING IN WELLBORE OPERATIONS Public/Granted day:2019-09-26
Information query