Method for slim hole single trip remedial or plug and abandonment cement barrier
Abstract:
A new tool and methodology to work, in a single-trip system, and create conduits through the casing or tubing to access the annuli, circulate out the annuli contents, accurately deliver the cement required to create the subsequent barrier. The tool and system provide a cost effective way of plugging an oil and gas well in a single trip without the need to remove in-place production casing.
Information query
Patent Agency Ranking
0/0