Real time productivity evaluation of lateral wells for construction decisions
Abstract:
In an aspect, a method includes receiving data characterizing measurements recorded while drilling a wellbore. The method can also include determining, using the measurements and a reservoir map, a storage capacity of the wellbore and a flow capacity of the wellbore. The method can further include determining a well construction plan using the storage capacity and the flow capacity. The method can also include providing the well construction plan. Related systems, techniques, and non-transitory computer readable mediums are also described.
Information query
Patent Agency Ranking
0/0