Well pad construction system and methods
Abstract:
A well pad construction system includes a construction area, surface compaction equipment to compact the construction area, an excavator disposed at the construction area and movable to generate an excavated area, a cellar disposed in the excavated area, controlled low-strength material (CLSM), and backfill equipment disposed around the excavated area. The backfill equipment is moveable over the construction area to pour CLSM into a gap between the cellar and surrounding medium in the excavated area for holding the cellar in place and providing a firm well pad from which a rig may operate.
Public/Granted literature
Information query
Patent Agency Ranking
0/0