Invention Grant
- Patent Title: Method of treating tunnel collapse using pavilion support
-
Application No.: US17292152Application Date: 2020-07-20
-
Publication No.: US11306588B2Publication Date: 2022-04-19
- Inventor: Xianghui Meng , Shibin Jiang , Weizhou Li , Hailiang Wang , Fu Yu , Wensheng He , Quanwei Liu , Chuan Li , Zhenbiao Wang , Lin Xin , Biao Kong , Xiangbao Meng , Yong Zhang , Wenming Zhang , Lide Hou , Jiufang Xiong , Xuanshan Zhang
- Applicant: SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY , CHINA COMMUNICATIONS CONSTRUCTION CO., LTD , QINGDAO WEST COAST RAIL TRANSIT CO., LTD , QINGDAO FIRST MUNICIPAL ENGINEERING CO., LTD , HEBEI FEIPU ENVIRONMENTAL PROTECTION TECHNOLOGY CO., LTD
- Applicant Address: CN Qingdao; CN Beijing; CN Qingdao; CN Qingdao; CN Shijiazhuang
- Assignee: SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY,CHINA COMMUNICATIONS CONSTRUCTION CO., LTD,QINGDAO WEST COAST RAIL TRANSIT CO., LTD,QINGDAO FIRST MUNICIPAL ENGINEERING CO., LTD,HEBEI FEIPU ENVIRONMENTAL PROTECTION TECHNOLOGY CO., LTD
- Current Assignee: SHANDONG UNIVERSITY OF SCIENCE AND TECHNOLOGY,CHINA COMMUNICATIONS CONSTRUCTION CO., LTD,QINGDAO WEST COAST RAIL TRANSIT CO., LTD,QINGDAO FIRST MUNICIPAL ENGINEERING CO., LTD,HEBEI FEIPU ENVIRONMENTAL PROTECTION TECHNOLOGY CO., LTD
- Current Assignee Address: CN Qingdao; CN Beijing; CN Qingdao; CN Qingdao; CN Shijiazhuang
- Agency: Hauptman Ham, LLP
- Priority: CN202010164054.7 20200311
- International Application: PCT/CN2020/102909 WO 20200720
- International Announcement: WO2021/179507 WO 20210916
- Main IPC: E21D19/00
- IPC: E21D19/00 ; E21D11/10 ; E21D11/15 ; E21D11/18 ; E21D15/44

Abstract:
A method of treating tunnel collapse includes leveling a collapse body and moving a pavilion support under the collapse cavity, lifting a shield plate until a lower edge of the shield plate surpasses a contour line of an initial supporting arch of a tunnel, connecting a bottom column and inserting a padding plate under a column. If the hydraulic prop retracts, the column, the bottom column, the padding plate and the hydraulic prop bear a load from the shield plate. Mounting and connecting the initial supporting arch, welding the intersection point of the column and the initial supporting arch, cutting off the column in the initial supporting arch. Transferring the load of the shield plate from the pavilion support to an initial supporting shed, spraying fast-setting concrete to a grid arch to form a closed shell, and pumping filling material to fill the space of the collapse cavity.