Invention Grant
- Patent Title: Volumetric fracturing method of temporarily plugging and diverting through functional slick water with oil displacement agent injected simultaneously
-
Application No.: US16952704Application Date: 2020-11-19
-
Publication No.: US11408264B2Publication Date: 2022-08-09
- Inventor: Weichu Yu , Ying Zhang , Rui Li , Hui Zhao , Lei Zhang , Wenjie Xia , Pingtian Fan , Baocheng Wu , Wenming Shu , Fei Ding
- Applicant: YANGTZE UNIVERSITY , Jingzhou Modern Petroleum Technology Development Co. LTD
- Applicant Address: CN Jingzhou; CN Jingzhou
- Assignee: YANGTZE UNIVERSITY,Jingzhou Modern Petroleum Technology Development Co. LTD
- Current Assignee: YANGTZE UNIVERSITY,Jingzhou Modern Petroleum Technology Development Co. LTD
- Current Assignee Address: CN Jingzhou; CN Jingzhou
- Agency: WPAT, PC
- Priority: CN202011143302.6 20201023
- Main IPC: E21B43/20
- IPC: E21B43/20 ; E21B33/138 ; E21B43/267 ; E21B49/00

Abstract:
Disclosed is a method for determining three-dimensional in-situ stress based on displacement measurement of borehole wall, including the following steps: pumping the prefluid and the sand-carrying fluid into the target interval, and injecting the biological oil displacement agent into the target interval in sequence; pumping temporary plugging agent into the target layer to implement crack plugging diverting; pumping the sand-carrying liquid into the target interval, and injecting the biological oil displacement agent into the target interval. The beneficial effect of the technical scheme proposed in this disclosure is: by injecting oil displacement agent to fracturing fluid, the temporary plugging diverting fracturing is integrated constructed with enhanced oil recovery, at the same time, it can overcome the incomplete removal of temporary plugging agent and the water lock effect of fracturing fluid caused by diverting fracturing.
Public/Granted literature
Information query