Method for operating electrical machines
Abstract:
A solution to optimally manage those requirements ensuring on the one hand, that the requirements set by the grid operators are appropriately and accurately accomplished at a point of interconnection (POI) and on the other hand, preventing the wind turbines from over fulfilling the requirements, for example, by remaining connected at voltages levels higher or lower than the ones required which, although possible, may cause higher loads and currents in the wind turbines than needed to fulfill the requirements.
Information query
Patent Agency Ranking
0/0