Plant evaluation system, plant evaluation method, and program
Abstract:
A plant evaluation system is configured to calculate performance of a plant while receiving setting of operating conditions of the plant and devices installed in the plant and simulating a secular change occurring in the plant during an evaluation target period included in the operating conditions. At least one of the devices is added, a selection of a component improving performance of a certain device is received, and an improvement of the performance of the device by the component is expected and the performance of the plant is calculated.
Public/Granted literature
Information query
Patent Agency Ranking
0/0