Live migration with guaranteed maximum migration downtimes
Abstract:
Methods and systems for improved live migration of computing processes with guaranteed maximum downtime are provided. In a first embodiment, a method is provided that includes migrating a computing process between two virtual machines according to a first migration phase. The computing process may continue executing during the first migration phase. A second migration phase may begin, in which execution of the computing process may stop. It may be detected that a duration of the second migration phase exceeds a predetermined period of time, and the second migration phase may be halted such that the computing process continues executing on an original virtual machine. The predetermined period of time can be determined based on a downtime for resuming execution of the computing process and a predicted worst case start time for the computing process.
Public/Granted literature
Information query
Patent Agency Ranking
0/0