Invention Grant
- Patent Title: Power grid resource allocation
-
Application No.: US17129426Application Date: 2020-12-21
-
Publication No.: US11630429B2Publication Date: 2023-04-18
- Inventor: Xiaoming Feng
- Applicant: Hitachi Energy Switzerland AG
- Applicant Address: CH Baden
- Assignee: Hitachi Energy Switzerland AG
- Current Assignee: Hitachi Energy Switzerland AG
- Current Assignee Address: CH Baden
- Agency: Slater Matsil, LLP
- Main IPC: G05B19/042
- IPC: G05B19/042 ; G06F17/10

Abstract:
A method of operating a power grid includes: generating, by a power management system of the power grid, an intermediate resource allocation schedule that provides a tentative schedule of resource allocation for power grid resources operating within the power grid; determining, by the power management system, whether the intermediate resource allocation schedule is feasible by checking whether the intermediate resource allocation schedule satisfies coupling constraints of a power grid resource allocation profile of the power grid indicative of an operation of the power grid constrained by power grid operational information; and in response to determining that the intermediate resource allocation schedule is infeasible, repairing, by the power management system, the intermediate resource allocation schedule to generate a feasible resource allocation schedule, where the repairing comprises determining whether a first dispatch solution obtained by solving a dispatch problem with fixed integer decisions from the intermediate resource allocation schedule is feasible.
Public/Granted literature
- US20220197232A1 Power Grid Resource Allocation Public/Granted day:2022-06-23
Information query
IPC分类: