Contamination prediction of downhole pumpout and sampling
Abstract:
A method may comprise positioning a downhole fluid sampling tool into a wellbore; performing a pressure test operation within the wellbore; performing a pumpout operation within the wellbore; identifying one or more formation parameters at least in part from the at least one pressure test operation or the at least one pumpout operation; building a correlation model that relates a pumpout trend to the one or more formation parameters; determining a time when the downhole fluid sampling tool takes a clean fluid sample utilizing at least the correlation model; and acquiring the clean fluid sample with the downhole fluid sampling tool from the wellbore. Additionally, a system may comprise a downhole fluid sampling tool configured to: perform a pressure test operation within a wellbore; and perform a pumpout operation within the wellbore.
Information query
Patent Agency Ranking
0/0