Adhesive barrier design to ensure proper paste flow during blade close process
Abstract:
Devices, systems, and methods of improving paste flow during the manufacture of wind turbine blades are provided. When the first turbine blade half is aligned with the second turbine blade half, a gap is formed between the first shell and the bond cap. The assembly includes a first mold half corresponding to the first turbine blade half and a second mold half corresponding to the second turbine blade half. When the first mold is aligned with the second mold, a second gap is formed. A first barrier is disposed within the first gap and a second barrier disposed within the second gap thereby fluidly sealing a volume defined by the first gap and the second gap to direct adhesive paste flow along the blade span between the adjoining leading and trailing edges.
Information query
Patent Agency Ranking
0/0