Off bottom cementing system
Abstract:
A method includes setting a tubular above a bottom of the well. The tubular having a float shoe attached to a distal end of the tubular and a controllable port penetrating a wall of the float shoe. The method further includes isolating a section of the annulus, opening the controllable port, and pumping cement through the controllable port into the section of the annulus to cement the annulus of the well.
Public/Granted literature
Information query
Patent Agency Ranking
0/0