Invention Grant
- Patent Title: Model predictive maintenance system with budgetary constraints
-
Application No.: US16457314Application Date: 2019-06-28
-
Publication No.: US11900287B2Publication Date: 2024-02-13
- Inventor: Robert D. Turney , Sudhi R. Sinha , Michael J. Wenzel , Mohammad N. Elbsat
- Applicant: Johnson Controls Technology Company
- Applicant Address: US MI Auburn Hills
- Assignee: Johnson Controls Tyco IP Holdings LLP
- Current Assignee: Johnson Controls Tyco IP Holdings LLP
- Current Assignee Address: US WI Milwaukee
- Agency: Foley & Lardner LLP
- Main IPC: G06Q10/20
- IPC: G06Q10/20 ; G06Q10/0631 ; G06N5/02

Abstract:
A model predictive maintenance (MPM) system for building equipment. The MPM system includes an equipment controller configured to operate the building equipment to affect a variable state or condition in a building. The MPM system includes an operational cost predictor configured to predict a cost of operating the building equipment over a duration of an optimization period. The MPM system includes a budget manager configured to generate one or more budget constraints. The MPM system includes an objective function optimizer configured to optimize an objective function subject to the one or more budget constraints to determine a maintenance and replacement schedule for the building equipment. The objective function includes maintenance and replacement costs of the building equipment and the predicted cost of operating the building equipment.
Public/Granted literature
- US20190325368A1 MODEL PREDICTIVE MAINTENANCE SYSTEM WITH BUDGETARY CONSTRAINTS Public/Granted day:2019-10-24
Information query