Invention Grant
- Patent Title: Reasonable millisecond time control method for excavation blasting of tunnel
-
Application No.: US18370567Application Date: 2023-09-20
-
Publication No.: US11920472B2Publication Date: 2024-03-05
- Inventor: Jun Gao , Liyun Yang , Xiao Lin , Ming Zhang , kaiwen Liu , Xiaowei Zuo , Bin Zhou , Feng Wang , Yuxin Gao , Dan Xu , Ling Wang , Zhengyi Wang , Xiaokai Wen , Yongtai Wang , Huiling Xue
- Applicant: China Railway Eleventh Bureau Group Co., Ltd , China Railway Eleventh Bureau Group Fourth Engineering Co., Ltd. , Wujiu Railway Passenger Dedicated Line Hubei Co., Ltd , China Railway Fourth Bureau Group Co., Ltd , Anhui China Railway Engineering Technology Service Co., Ltd , Wuhan Institute of Geotechnical Mechanics, Chinese Academy of Sciences , China Railway Southwest Scientific Research Institute Co., Ltd
- Applicant Address: CN Wuhan
- Assignee: CHINA RAILWAY ELEVENTH BUREAU GROUP CO., LTD,CHINA RAILWAY ELEVENTH BUREAU GROUP FOURTH ENGINEERING CO., LTD.,WUJIU RAILWAY PASSENGER DEDICATED LINE HUBEI CO., LTD,CHINA RAILWAY FOURTH BUREAU GROUP CO., LTD,ANHUI CHINA RAILWAY ENGINEERING TECHNOLOGY SERVICE CO., LTD,WUHAN INSTITUTE OF GEOTECHNICAL MECHANICS, CHINESE ACADEMY OF SCIENCES,CHINA RAILWAY SOUTHWEST SCIENTIFIC RESEARCH INSTITUTE CO., LTD
- Current Assignee: CHINA RAILWAY ELEVENTH BUREAU GROUP CO., LTD,CHINA RAILWAY ELEVENTH BUREAU GROUP FOURTH ENGINEERING CO., LTD.,WUJIU RAILWAY PASSENGER DEDICATED LINE HUBEI CO., LTD,CHINA RAILWAY FOURTH BUREAU GROUP CO., LTD,ANHUI CHINA RAILWAY ENGINEERING TECHNOLOGY SERVICE CO., LTD,WUHAN INSTITUTE OF GEOTECHNICAL MECHANICS, CHINESE ACADEMY OF SCIENCES,CHINA RAILWAY SOUTHWEST SCIENTIFIC RESEARCH INSTITUTE CO., LTD
- Current Assignee Address: CN Wuhan; CN Wuhan; CN Wuhan; CN Hefei; CN Hefei; CN Wuhan; CN Chengdu
- Agency: WPAT, PC
- Priority: CN 2210882101.0 2022.07.26
- Main IPC: E21D9/00
- IPC: E21D9/00

Abstract:
A reasonable millisecond time control method for excavation blasting of a tunnel is provided, and includes: acquiring physical mechanical parameters to establish a millisecond blasting model, and designing four dimensions blasting parameters of explosive quantity, hole number, inter-hole millisecond and inter-row millisecond; simulating, based on the millisecond blasting model, a blasting process of an explosive package using blasting parameters to obtain a blasting vibration curve; obtaining single-hole blasting vibration waveforms, solving a vibration synthesis curve through a vibration synthesis theory; comparing the vibration synthesis curve with the blasting vibration curve to obtain a coupling relationship of blasting parameters; determining a target group of explosive quantity and hole numbers, determining a target millisecond through the coupling relationship of blasting parameters, and relating a millisecond blasting control strategy to control, and it is used for tunneling project to reduce cut blasting vibration intensity and achieve precise and intelligent control of millisecond blasting.
Public/Granted literature
- US20240035381A1 REASONABLE MILLISECOND TIME CONTROL METHOD FOR EXCAVATION BLASTING OF TUNNEL Public/Granted day:2024-02-01