Invention Grant
- Patent Title: Scheduling multiple work projects with a shared resource
-
Application No.: US17484029Application Date: 2021-09-24
-
Publication No.: US11948107B2Publication Date: 2024-04-02
- Inventor: Krishan Kumar Meghani , Gona Uday Kumar , Kiran Kumar Bodla , Tanna Rahul Udaya Kiran , Kalyan Madhavaram , Jyotirmoy Verma
- Applicant: Hexagon Technology Center GmbH
- Applicant Address: CH Heerbrugg
- Assignee: Hexagon Technology Center GmbH
- Current Assignee: Hexagon Technology Center GmbH
- Current Assignee Address: CH Heerbrugg
- Agency: Nutter McClennen & Fish LLP
- Main IPC: G06Q10/06
- IPC: G06Q10/06 ; G06N3/08 ; G06Q10/0631

Abstract:
A system for generating task schedules using an electronic device includes: a processor, the processor comprising neural networks; a memory coupled to the processor; a scheduler coupled to the processor, the scheduler is configured to: receive: a total work database configured to contain items representing work packages; a resources database configured to contain items representing resources required to fulfill items in the work packages; a constraints database configured to contain items representing constraints to fulfilling items in the work packages; and a scheduling objective database configured to designate a prime objective that is to be achieved by the optimum task schedule; provide a trained reinforcement learning engine for optimizing the task schedule based on inputs from the databases; and generate an optimum work package schedule to sequence the work packages using the trained reinforcement learning engine, wherein the optimum work package schedule maximizes the one or more prime objectives.
Public/Granted literature
- US20230095600A1 SCHEDULING MULTIPLE WORK PROJECTS WITH A SHARED RESOURCE Public/Granted day:2023-03-30
Information query