Invention Grant
- Patent Title: Method for constructing large-span station with two-wing open type half-cover excavation and half-reverse construction
-
Application No.: US18357174Application Date: 2023-07-24
-
Publication No.: US11959243B2Publication Date: 2024-04-16
- Inventor: Fucai Hua , Gang Lei , Zhihui Yang , Jianye Zhu , Liang Zhang , Ning Li , Yanan Dong , Ningning Li
- Applicant: Beijing Urban Construction Design&Development Group Co., Limited , Fucai Hua , Gang Lei , Zhihui Yang , Jianye Zhu
- Applicant Address: CN Beijing
- Assignee: Beijing Urban Construction Design & Development Group Co., Limited,Fucai Hua,Gang Lei,Zhihui Yang,Jianye Zhu
- Current Assignee: Beijing Urban Construction Design & Development Group Co., Limited,Fucai Hua,Gang Lei,Zhihui Yang,Jianye Zhu
- Current Assignee Address: CN Beijing; CN Beijing; CN Beijing; CN Beijing; CN Beijing
- Agency: True Shepherd LLC
- Agent Andrew C. Cheng
- Priority: CN 2211083153.8 2022.09.06
- Main IPC: E02D29/05
- IPC: E02D29/05 ; E02D15/04 ; E02D17/04

Abstract:
A method for constructing a large-span station by two-wing open type semi-covered excavation and semi-reverse construction, is divided into three stages of excavation. First, excavate a first-stage inner small foundation pit, then excavate a second-stage annular foundation pit within the first-stage retaining piles and outside the range of the first-stage inner small foundation pit, and finally excavate a third-stage semi-covered excavation foundation pit below the first-stage inner small foundation pit and the second-stage annular foundation pit. By setting graded retaining piles, middle upright post piles, middle top plates, local waist beams and local concrete supports in the soil-rock combination strata, so that the force transfer between the foundation pit enclosure and the station main body structures and the underlying rock layer is clear and reliable, and a stable frame structure is achieved.