Well construction optimization techniques
Abstract:
A method includes acquiring historical well construction data associated with a set of historical wells. The method also includes developing a well construction model using the corpus of historical well construction data. Additionally, the method includes acquiring real-time well construction data during a well construction operation and applying the well construction model to the real-time well construction data to identify changes to a well construction parameter. Further, the method includes outputting a command to update the well construction operation using the changes to the well construction parameter.
Public/Granted literature
Information query
Patent Agency Ranking
0/0