Invention Grant
US07805329B2 Development of actual risk costs based on estimated risk costs as well as probabilistic restriction of the actual risk costs 有权
根据估计的风险成本开发实际风险成本以及实际风险成本的概率限制

Development of actual risk costs based on estimated risk costs as well as probabilistic restriction of the actual risk costs
Abstract:
An evaluation is performed for a device, an application and/or a method, in particular a method for establishing a technical system such as a power plant for instance, the assessment being carried out on the basis of costs for risks. In accordance with the method, the costs for specific risks are to be assessed. A risk costs interval is to be determined, which contains the actual risk costs with high probability. This is achieved by a regression of intuitive assignments to a straight line by an indirect linear regression by a non-linear regression in an intermediate diagram.