Invention Grant
US07955028B2 Marine pipelaying system and method for installing an offshore pipeline that includes one or more accessories
有权
海上管道铺设系统和安装包括一个或多个附件的海上管道的方法
- Patent Title: Marine pipelaying system and method for installing an offshore pipeline that includes one or more accessories
- Patent Title (中): 海上管道铺设系统和安装包括一个或多个附件的海上管道的方法
-
Application No.: US11883850Application Date: 2005-02-08
-
Publication No.: US07955028B2Publication Date: 2011-06-07
- Inventor: Joop Roodenburg , Anne Klaas De Groot , Diederick Bernardus Wijning
- Applicant: Joop Roodenburg , Anne Klaas De Groot , Diederick Bernardus Wijning
- Applicant Address: NL Schiedam
- Assignee: ITREC B V
- Current Assignee: ITREC B V
- Current Assignee Address: NL Schiedam
- Agency: Birch, Stewart, Kolasch & Birch, LLP
- International Application: PCT/NL2005/000093 WO 20050208
- International Announcement: WO2006/085739 WO 20060817
- Main IPC: F16L1/14
- IPC: F16L1/14

Abstract:
Marine pipelaying method and system for installing an offshore pipeline (1) that includes one or more accessories (10). The method includes the steps of providing a vessel (2), launching the pipeline (1) in a firing line from the vessel (2) in the direction of the seabed, engaging the pipeline (1) with a clamping device (5b) that is connected to the vessel (2) and adapted to support the weight of the previously launched pipeline (1), and moving the accessory (10) into the firing line to a position above the clamping device (5b). Then the accessory (10) is connected to the pipeline (1) above the clamping (5b) device while the pipeline (1) is held by the clamping device (5b) Follow that the accessory (10) and the launched pipeline (1) connected thereto and releasably secured to a controlled load hoisting device (5) and the weight of the accessory (10) and the launched pipeline (1) connected thereto are transferred from the clamping device (5b) to the controlled load hoisting device (5) while the accessory (10) and the launched pipeline (1) connected thereto remain in the firing line. Finally the clamping device (5b) is disengaged from the pipeline (1) and moved away from firing line. Then the accessory (10) and the launched pipeline (1) connected thereto are lowered along the firing line by the controlled load hoisting device (5).
Public/Granted literature
Information query