Invention Grant
US07987013B2 Estimating yield fluctuation for back-end planning 有权
估计后端计划的收益波动

Estimating yield fluctuation for back-end planning
Abstract:
A method for production planning includes receiving a first order quantity of a first device. A first yield estimate of the first device from a production line is determined. The first yield estimate is adjusted based on a first confidence factor associated with the first order quantity. A dispatch quantity for processing in the production line is determined based on the first order quantity and the adjusted first yield estimate.
Public/Granted literature
Information query
Patent Agency Ranking
0/0