Invention Grant
US08082546B2 Job scheduling to maximize use of reusable resources and minimize resource deallocation 有权
作业调度以最大限度地利用可重用的资源,并最大限度地减少资源的分配

Job scheduling to maximize use of reusable resources and minimize resource deallocation
Abstract:
Jobs are scheduled such that resource reuse is maximized and deallocation of reusable resources is minimized. A multi-phase scheduling capability is provided in which during a first phase, weights are assigned to the reusable resources, and during a second phase, the jobs are scheduled. If reusable resources are available for the job, the job is assigned to those resources. Otherwise, a search is performed for a solution which minimizes the weight and number of reusable resources that are to be deallocated.
Information query
Patent Agency Ranking
0/0