Invention Grant
US08082546B2 Job scheduling to maximize use of reusable resources and minimize resource deallocation
有权
作业调度以最大限度地利用可重用的资源,并最大限度地减少资源的分配
- Patent Title: Job scheduling to maximize use of reusable resources and minimize resource deallocation
- Patent Title (中): 作业调度以最大限度地利用可重用的资源,并最大限度地减少资源的分配
-
Application No.: US11537429Application Date: 2006-09-29
-
Publication No.: US08082546B2Publication Date: 2011-12-20
- Inventor: Richard J. Coppinger , Alexander Druyan
- Applicant: Richard J. Coppinger , Alexander Druyan
- Applicant Address: US NY Armonk
- Assignee: International Business Machines Corporation
- Current Assignee: International Business Machines Corporation
- Current Assignee Address: US NY Armonk
- Agency: Heslin Rothenberg Farley & Mesiti P.C.
- Agent Steven Chiu
- Main IPC: G06F9/46
- IPC: G06F9/46 ; G06F15/173

Abstract:
Jobs are scheduled such that resource reuse is maximized and deallocation of reusable resources is minimized. A multi-phase scheduling capability is provided in which during a first phase, weights are assigned to the reusable resources, and during a second phase, the jobs are scheduled. If reusable resources are available for the job, the job is assigned to those resources. Otherwise, a search is performed for a solution which minimizes the weight and number of reusable resources that are to be deallocated.
Public/Granted literature
- US20080082979A1 JOB SCHEDULING TO MAXIMIZE USE OF REUSABLE RESOURCES AND MINIMIZE RESOURCE DEALLOCATION Public/Granted day:2008-04-03
Information query