Invention Grant
US08091087B2 Scheduling of new job within a start time range based on calculated current load and predicted load value of the new job on media resources
有权
根据媒体资源上新作业的当前负载和预测负载值计算开始时间范围内的新作业
- Patent Title: Scheduling of new job within a start time range based on calculated current load and predicted load value of the new job on media resources
- Patent Title (中): 根据媒体资源上新作业的当前负载和预测负载值计算开始时间范围内的新作业
-
Application No.: US11737916Application Date: 2007-04-20
-
Publication No.: US08091087B2Publication Date: 2012-01-03
- Inventor: Abid Ali , Asim Mitra
- Applicant: Abid Ali , Asim Mitra
- Applicant Address: US WA Redmond
- Assignee: Microsoft Corporation
- Current Assignee: Microsoft Corporation
- Current Assignee Address: US WA Redmond
- Agency: Senniger Powers LLP
- Main IPC: G06F9/45
- IPC: G06F9/45

Abstract:
Method for scheduling a new backup job within a backup application to optimize a utilization of a media resource of said backup application. The backup application includes one or more previously scheduled backup jobs. The backup application calculates a current load of the media resource as a function of the previously scheduled backup jobs and the media resource and predicts a load value for the new backup job as a function of job parameters associated with the new backup job. Then, the backup application schedules the new backup job as a function of the calculated current load and the predicted load value such that the resulting load on the media resource will yield a minimum peak percentage utilization of the media resource. Alternatively, the backup application schedules the new backup job and previously scheduled backup jobs as function of the calculated current load and the predicted load value such that the resulting load on the media resource will yield a minimum peak percentage utilization of the media resource.
Public/Granted literature
- US20080263551A1 OPTIMIZATION AND UTILIZATION OF MEDIA RESOURCES Public/Granted day:2008-10-23
Information query