Invention Grant
US08166596B2 Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same 失效
桥梁大梁施工方法,起重机起重机梁,起重机车梁及相同的大梁

Construction method for girder in bridge, crane for pulling up girder, vehicle for carring girder, and girder used for the same
Abstract:
A construction method for a girder in a bridge in which a plurality of piers are installed in an interval in a longitudinal direction of the bridge, a plurality of copings are installed on the piers, and a plurality of girders respectively installed between the piers are installed on the copings. The method comprises the steps of: installing at least one temporary girder on a front coping of the copings and a rear coping adjacent to the rear coping of the copings; installing a crane for pulling up a girder having a girder pulling up space therein guided by the temporary girder; and providing with a girder by a pre-cast method so as to install a girder on the front coping and the rear coping.
Information query
Patent Agency Ranking
0/0