Invention Grant
US08190282B2 Work management apparatus, picking carriage, work performance collection system, rework measurement system, workability management system, rework measurement measuring method, work performance collection method, workability management method and workability management program
有权
工作管理设备,采摘车,工作绩效收集系统,返工测量系统,可操作性管理系统,返工测量测量方法,工作绩效收集方法,可操作性管理方法和可操作性管理程序
- Patent Title: Work management apparatus, picking carriage, work performance collection system, rework measurement system, workability management system, rework measurement measuring method, work performance collection method, workability management method and workability management program
- Patent Title (中): 工作管理设备,采摘车,工作绩效收集系统,返工测量系统,可操作性管理系统,返工测量测量方法,工作绩效收集方法,可操作性管理方法和可操作性管理程序
-
Application No.: US11757489Application Date: 2007-06-04
-
Publication No.: US08190282B2Publication Date: 2012-05-29
- Inventor: Satoshi Ohishi , Yonemitsu Niimura , Hiroyuki Seya
- Applicant: Satoshi Ohishi , Yonemitsu Niimura , Hiroyuki Seya
- Applicant Address: JP Tokyo
- Assignee: Hitachi, Ltd.
- Current Assignee: Hitachi, Ltd.
- Current Assignee Address: JP Tokyo
- Agency: Antonelli, Terry, Stout & Kraus, LLP.
- Priority: JP2006-160584 20060609; JP2006-160585 20060609; JP2006-160733 20060609; JP2006-174466 20060623; JP2006-174811 20060626; JP2006-211782 20060803
- Main IPC: G06F19/00
- IPC: G06F19/00

Abstract:
The invention aims at providing a work performance collection system for reliably collecting information of work performance without applying a burden to a worker in assembly of a work object article. This system includes a work specification ID tag into which information for specifying a work content of a work object article is written, a work management box having a throw-in port into which the work specification ID tag is thrown at the time of work, and an ID tag reader provided to a side surface of the work management box, for reading the work specification ID tag and transmitting the information read to a work performance management apparatus. A worker is required to only throw the work specification ID tag into the work management box at the start of work and to only take out the work specification ID tag at the end of work.
Public/Granted literature
Information query