Invention Grant
- Patent Title: Method for fault location in uncompensated power lines with two-end unsynchronized measurement
- Patent Title (中): 无补偿电力线故障定位方法,具有两端不同步测量
-
Application No.: US12669502Application Date: 2008-06-23
-
Publication No.: US08207743B2Publication Date: 2012-06-26
- Inventor: Przemyslaw Balcerek , Marek Fulczyk , Eugeniusz Rosolowski , Jan Izykowski , Murari Saha
- Applicant: Przemyslaw Balcerek , Marek Fulczyk , Eugeniusz Rosolowski , Jan Izykowski , Murari Saha
- Applicant Address: CH Zurich
- Assignee: ABB Research Ltd.
- Current Assignee: ABB Research Ltd.
- Current Assignee Address: CH Zurich
- Agent Paul R. Katterle
- Priority: EP07460017 20070719
- International Application: PCT/EP2008/005223 WO 20080623
- International Announcement: WO2009/010169 WO 20090122
- Main IPC: G01R31/08
- IPC: G01R31/08

Abstract:
A method is provided for fault location in uncompensated power lines with two-end unsynchronized measurement, finding an application in the power industry and for overhead and overhead-cable transmission or distribution lines. The method according to the invention includes measuring the voltage and currents at both ends (A) and (B) of the section, obtaining the phasor of the positive sequence voltages (VA1, VB1) measured at the ends (A) and (B), respectively, obtaining the phasor of the positive sequence currents (IA1, IB1) measured at the ends (A) and (B), respectively, determining whether there is a three-phase balanced fault, and using either a first subroutine or a second subroutine (depending on whether or not there is a fault), determining a distance (d) to the fault.
Public/Granted literature
- US20110037480A1 METHOD FOR FAULT LOCATION IN UNCOMPENSATED POWER LINES WITH TWO-END UNSYNCHRONIZED MEASUREMENT Public/Granted day:2011-02-17
Information query