Invention Grant
US08212591B2 Control of a resonant switching system with monitoring of the working current in an observation window 有权
在观察窗口中监视工作电流的谐振开关系统的控制

Control of a resonant switching system with monitoring of the working current in an observation window
Abstract:
Controlling a resonant switching system, which includes a first switch and a second switch in a half-bridge configuration for driving a resonant load. A corresponding control system includes command means for switching on and switching off the switches alternatively according to a working frequency of the switching system. The control system includes detection means for detecting a zeroing of a working current being supplied by the switching system to the resonant load in a temporal observation window; the observation window follows each switching off of at least one of the switches, and has a length equal to a fraction of a to working period of the switching system. Correction means are then provided for modifying the working frequency in response to each detection of the zeroing in the observation window.
Information query
Patent Agency Ranking
0/0