Invention Grant
US08290607B2 Planning method and system for optimizing stock and production plan in batch process industry
失效
批量生产行业优化库存和生产计划的规划方法和制度
- Patent Title: Planning method and system for optimizing stock and production plan in batch process industry
- Patent Title (中): 批量生产行业优化库存和生产计划的规划方法和制度
-
Application No.: US12603975Application Date: 2009-10-22
-
Publication No.: US08290607B2Publication Date: 2012-10-16
- Inventor: Philippe Couronne , Filippo Focacci , Frederic Paulin
- Applicant: Philippe Couronne , Filippo Focacci , Frederic Paulin
- Applicant Address: US NY Armonk
- Assignee: International Business Machines Corporation
- Current Assignee: International Business Machines Corporation
- Current Assignee Address: US NY Armonk
- Agency: Carey, Rodriguez, Greenberg & O'Keefe
- Agent Steven M. Greenberg, Esq.
- Main IPC: G06F19/00
- IPC: G06F19/00

Abstract:
The method provides a planning system where production plans and safety stocks are determined simultaneously, thus resulting in coupled target stock calculation and production plan. The closer the manufacturing process gets to the next production event, the lower the safety stock needs to be. In this approach, assumptions on the average production lead time—which might be wrong—do not need to be made. Indeed, if the production plan and the safety stock are simultaneously computed, it is clear when the next production is going to occur. As a result, production variability only needs to be considered in relation to the probability of unexpected events in manufacturing (e.g. a machine breakdown) as opposed to taking provision for variability of the production cycle due to situations that can be anticipated at the planning step.
Public/Granted literature
- US20110098834A1 PLANNING METHOD AND SYSTEM FOR OPTIMIZING STOCK AND PRODUCTION PLAN IN BATCH PROCESS INDUSTRY Public/Granted day:2011-04-28
Information query