US08321257B2 Managing project schedule data using separate current and historical task schedule data
有权
使用单独的当前和历史任务计划数据来管理项目进度数据
- Patent Title: Managing project schedule data using separate current and historical task schedule data
- Patent Title (中): 使用单独的当前和历史任务计划数据来管理项目进度数据
-
Application No.: US12122392Application Date: 2008-05-16
-
Publication No.: US08321257B2Publication Date: 2012-11-27
- Inventor: Tetsuro Motoyama , Avery Fong
- Applicant: Tetsuro Motoyama , Avery Fong
- Applicant Address: JP Tokyo
- Assignee: Ricoh Company, Ltd.
- Current Assignee: Ricoh Company, Ltd.
- Current Assignee Address: JP Tokyo
- Agency: Hickman Palermo Truong Becker Bingham Wong LLP
- Main IPC: G06Q10/00
- IPC: G06Q10/00

Abstract:
A project management system manages project schedule data using separate current and historical task schedule data structures. In general, current schedule data is stored separately from historical schedule data, so that the current schedule data may be retrieved separately from the historical task schedule data. The project management system may also maintain unscheduled tasks as “to-do lists.” Tasks may be added to a member's schedule without specifying any planned dates and the tasks are added to the database. The tasks have an associated revision number of 0 to indicate that the tasks were added, but not yet scheduled. The tasks are displayed in the member schedule editor and in Web page schedules. The tasks may then be displayed in the member schedule editor and in Web page schedules in a manner that allows a user to readily determine that the tasks are “to-do list” tasks.